UNI CLEVER model L/R

  • The painting machine is designed for throughput operations;
  • The painting machine is equipped with paint recovery system;
  • Main conveyor belt is equipped with a squeegee paint recovery system;
  • Loading/input clocking conveyor is equipped with smooth belt coverage;
  • Outfeed conveyor is equipped with grooved belt coating;
  • 2D scanner automatically recognizes position, width, and length of painted elements; it is integrated with PLC;
  • The cover located in the loading and unloading area automatically closes and opens to ensure maximum cleanliness in the lacquering area.

Preferred for the industry:


Electrical connection3 x 400 VAC / 50 Hz
Supply power18,25 kW
Supply fan power2 x 0,75 kW
Max. supply fan capacity11.800 m³/h
Exhaust fan power3 kW
Max. extraction fan capacity/td>10.000 m³/h
Compressed air pressure6 bar
Compressed air consumption100 l/min (excluding paint spray guns)
Weight6.120 kg
Maximum dimensions of coated elements
[L x W x H]
2.800 x 1100 x 350 mm
Weight of coated elementsup to 100 kg
Approximate painting time of working area (depending on preset painting parameters)1,5 - 3 min
Loading time of elements into the working areaup to 10m/min
  • Clocked or throughput mode are available;
  • Any number of work-pieces may be placed on the conveyor;
  • Edges of the elements may be painted once or several times; surfaces may be cross-varnished to obtain the best results;
  • Appropriate painting programs - previously defined for e.g. rectangular elements, elements with so-called "hidden handles", milled elements, solids, and spatial elements - may be saved and then selected;
  • Squeegee paint recovery system is applied;
  • A squeegee belt cleaning system with an external cleaning agent tank are available;
  • Paint flows gravitationally to the recovery container;
  • Main conveyor belt is resistant to solvents;
  • Exhaust filters are located on both sides of the main conveyor;
  • A drawer system is applied for the purpose of quick and easy dimensioning of the extraction filters;
  • Preferred number of operators shall be 2 persons (operator and assistant).
  • Follow-up operation mode (the paint head moves along with the moving parts to be varnished while the main conveyor is running) is available;
  • An additional set of squeegees enables quick colour change;
  • Replaceable holder is provided for fixing a second set of paint spray guns;
  • System of interchangeable low-pressure tanks is installed near the spray guns;
  • Automatic paint spray gun cleaning system is applied;
  • Painting equipment (e.g. automatic paint guns, low and high pressure pumps, pressure tanks, etc.) is also applied.
  • The control panel is installed on the left or right side of the loading zone on the paint machine;
  • Number of paint circuits for painting short and long batches is configurable;
  • The exhaust fan may be located in various positions depending on the amount of space available to the painting machine;
  • It can be installed in line with the tray dryer or a drying tunnel.

Technical drawings


    English