UNI CLEVER model L/H

  • The painting machine is designed for throughput operations;
  • It includes chain main, loading and unloading conveyors;
  • These are conveyors adapted for fastening lacquered elements on intermediate transport elements (so-called trays), which determine their position and place and prevent them from moving during lacquering and sliding operations;
  • Position of so-called trays on the loading conveyor to optimise the work of the paint machine is automatically recognised.

Preferred for the industry:


Electrical connection3 x 400 VAC / 50 Hz
Supply power16,14 kW
Supply fan power2 x 0,75 kW
Max. supply fan capacity11.800 m³/h
Exhaust fan power2 x 2,2 kW
Max. extraction fan capacity14.400 m³/h
Compressed air pressure6 bar
Compressed air consumption -
Weight5.570 kg
Maximum dimensions of coated elements
[L x W x H]:
1.100 x 1100 x 360 mm
Weight of coated elementsup to 100 kg
Approximate painting time of working area
(depending on preset painting parameters)
1 - 2 min/tray
Loading time of elements into the working area1 m/min
  • Clocked, continuous, or follow-up modes are available;
  • Arrangement of optimal amount of details on so-called trays depending on their size and shape may be carried out;
  • Edges or sides of the elements may be painted once or several times; surfaces may be cross-varnished to obtain the best results;
  • Previously defined varnishing programmes may be saved and then selected;
  • Enlarged-surface extraction filters are located on both sides of the main conveyor and directly under the painting zone;
  • A drawer system is applied for the purpose of quick and easy dimensioning of the extraction filters;
  • Preferred number of operators shall be 2 persons (operator and assistant).
  • Replaceable holder is provided for fixing a second set of paint spray guns;
  • System of interchangeable low-pressure tanks is installed near the spray guns;
  • Automatic paint spray gun cleaning system is applied;
  • Painting equipment (e.g. automatic paint guns, low and high pressure pumps, pressure tanks, etc.) is also applied.
  • The control panel is installed on the left or right side of the loading zone on the paint machine;
  • Number of paint circuits for painting short and long batches or various varnish materials are configurable;
  • It may be installed in the existing painting booth;
  • The exhaust fan may be located in various positions depending on the amount of space available to the painting machine;
  • It can be installed in line with the tray dryer or a drying tunnel.